LTS Energy
NEWS DETAILS

1.01.14 | MULTIPLE AWARDS FROM ANADARKO PETROLEUM

LTS has been awarded multiple design and construction Contracts covering 15,000psi Boarding Valve Stations for the Heidelberg Subsea Riser, as well as the Production Closure and Export Oil and Gas Vertical Pig Launcher Systems featuring LTS ClampTec® hydraulic automated Closures, and FlangeTec® Compact Flanges utilized on all 10M and Class 2500lbs piping classes. The Anadarko Heidelberg Project situated in the Gulf of Mexico utilizes the latest SPAR design technology where weight and space savngs are critical. The multiple Contacts are valued in excess of $6M and will be completed in the 4th quarter of 2014.
See more news headlines >>  
HP/HT Pig Launcher & Receiver Systems
HP/HT Flowline Products
HP/HT Piping & Wellhead Products
HP/HT Flow Control Products